When creating a production of Water Detection the result sometimes need an extra editing: Not all the water was detected and in this area water are rising (screenshots attached) Some of Non-water is selected and this area is flat (screenshots atta...
Include tool to break completed 3SMs into smaller or multiple pieces
We have generated many complicated Reality Meshs for a processing plant project. I'd like to be able to break a completed 3SM into smaller pieces (sub-sets) to make the data more managable and more focused for different teams. Currently, I need to...
When I pick a control point in the surveys tab the photo that is selected is unselected and I'm returned to the beginning of the list. This was not the case in previous versions. The selected photo needs to remain selected, because that is where I...
Thanks to the latest realese from Cesium, i would love to have the possibility to export new Cesium 3D Tiles 1.1 Format with all kind of images compression through GlTF pipeline
Time and storage space info needed for production (approximate)
Please include approximate calculation of time needed and storage space on drive requirement before starting production. Production of large areas need careful calculation of these in order to production to succeed.
Add Landxml as mesh constraint. LandXML is format exported from field surveying so could be directly utilized. For example water outlines are surveyed and need to be imported.